Croatia PLOCE Project of CNBM Engineering Enters into Producing and Manufacturing Stage
Source: CNBM Engineering
Date: Nov 7, 2016
Recently, Croatia PLOCE project contracted by CNBM Engineering has been approved and entered into producing and manufacturing stage.
This project is a bulk cargo handling system which is comprised of a 2000TPH ship unloader and a 2000/4000TPH stacker-reclaimer. It is CNBM’s first Europe port project in the process of “going out”. Being rigorous with technology of the project, the company’s technology team can ensure that design is in conformity with Europe standard. Main material of the project is Europe standard material and components for the project has already got CE certificate. Meanwhile, the company’s project management can also meet EN1090’s requirement. As a result, the project was approved by the owner. Currently, equipments for the project are under manufacturing. Main structural parts for ship unloader were already completed and are now in the assembling and paint spraying stage; manufacturing of stacker-recaimer main structural parts are underway. After checking the manufacturing process, supervisor for the owner highly recognized quality of the equipment. At the moment, the whole project is going on in an orderly manner.
Based on the smooth going of Croatia port project, CNBM Engineering has discussed with owner regarding the plausibility of Croatia’s port logistic park. The discussion was seen as a further extension and expansion by CNBM in Middle East and east Europe market.